24 News Hour-News Matters
24 News Hour-News Matters
  • Home
  • Business
  • Education
  • Entertainment
  • News Update
  • Others
    • Technology
    • Health & Lifestyle
  • Privacy Policy
  1. Home
  2. Business
  3. Sterlite Power wins Green Energy Transmission Project in Rajasthan
Business

Sterlite Power wins Green Energy Transmission Project in Rajasthan

 Sterlite Power wins Green Energy Transmission Project in Rajasthan

New Delhi, March 18, 2023: Sterlite Power, a leading power transmission company in India and Brazil, has been awarded the transmission project for evacuation of power from Renewable energy zones in Rajasthan under Phase-III Part G. The project was bid out through tariff-based competitive bidding (TBCB) process. Sterlite Power received the Letter of Intent (LoI) from PFC Consulting Limited (a wholly owned subsidiary of Power Finance Corporation), to build the project on BOOT (build, own, operate, transfer) basis, for a period of 35 years.

The entire transmission system forms a critical part of the roadmap released by Ministry of Power in 2022 for integration of over 500 GW RE Capacity to the national grid by 2030. The project will involve construction of a 350km, 765kV transmission corridor from Fatehgarh III to Beawar in Rajasthan. It will enable evacuation of a part of 20 GW of renewable power from Renewable Energy Zones in Fatehgarh (9.1 GW), Bhadla (8 GW) and Ramgarh (2.9 GW) areas of the state.

Commenting on the bid win, Pratik Agarwal, Managing Director, Sterlite Power said, “We are very happy to win another Green Energy Corridor transmission project which is vital to India’s energy transition playbook. This is our eighteenth transmission project in the country, and with our strong capabilities and experience, we are well poised to deliver another world class asset to the nation.”

This is the second green energy project for the company and its first in the state of Rajasthan. Recently, Sterlite Power commissioned its first green energy project, i.e., Lakadia -Vadodara power transmission project in Gujarat. Since its commissioning, the ~300 Km long project, is playing a vital role in supplying 5,000MW of reliable and green power from renewable energy-rich state of Gujarat to the Indian national grid. It is also one of the largest transmission corridors built in India till date.

Previous post
Next post

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • TADKA on JioHotstar Hits 100 Million Users, Establishes Itself as the Top Destination for Micro Content Storytelling
  • Rare Cancerous Lung Tumour Successfully Removed in 43-Year-Old Woman via complex Procedure at Fortis Escorts Jaipur
  • Who can donate blood? Breaking myths around eligibility and safety
  • Brain Tumors Explained: Understanding Benign vs. Malignant and Why Early Detection Matters
  • Swad ka Superstar Pushp Brand files for IPO, plans to expand portfolio with new blends and VAS products
Latest News
Entertainment

TADKA on JioHotstar Hits 100 Million Users, Establishes Itself as

June 13, 2026
Health & Lifestyle

Rare Cancerous Lung Tumour Successfully Removed in 43-Year-Old Woman via

June 12, 2026
Health & Lifestyle

Who can donate blood? Breaking myths around eligibility and safety

June 12, 2026
Health & Lifestyle

Brain Tumors Explained: Understanding Benign vs. Malignant and Why Early

June 10, 2026
Copyright © 2026 Qoxag. All Right Reserved.