24 News Hour-News Matters
24 News Hour-News Matters
  • Home
  • Business
  • Education
  • Entertainment
  • News Update
  • Others
    • Technology
    • Health & Lifestyle
  • Privacy Policy
  1. Home
  2. Business
  3. ONGC’s Coal Bed Methane block in Bokaro commissions new Gas Collecting Station
Business

ONGC’s Coal Bed Methane block in Bokaro commissions new Gas Collecting Station

 ONGC’s Coal Bed Methane block in Bokaro commissions new Gas Collecting Station

New Delhi, 12 April, 2023 : Oil and Natural Gas Corporation Limited (ONGC) has successfully commissioned a new Gas Collecting Station (GCS) in its Bokaro Coal Bed Methane block. It is the first gas collecting cum gas compression station in the Bokaro CBM (Coal Bed Methane) Block. This marks a major achievement in bringing ONGC on the CBM map of India as a bulk CBM producer.

GCS-Bokaro is a major production installation in Patch-A of Bokaro CBM Block of ONGC-IOCL Joint Venture (Participating Interest: 80:20) with ONGC as the JV operator.

CBM Asset has executed a tie-in agreement with GAIL for pipeline connectivity with its Urja Ganga Pipeline for the sale of gas from GCS-Bokaro. In addition, the Asset has facilitated the signing of Gas Sales Agreements (GSAs) with five gas customers, realizing the highest-ever premium of USD 7.1 per MMBTU over Brent linked base crude oil price of ~USD 14 per MMBTU.

The GCS- Bokaro project, including its well site facilities and pipeline network was conceived by CBM Asset and executed by the consortium of M/s Tata Projects Limited and M/s Corrtech International Pvt. Ltd. under a contract awarded by OES, Delhi. The total cost of the project is around Rs.441 crore.

GCS-Bokaro is designed to process 1 MMSCMD of CBM gas and handle 750 m3/day of produced water. The installation is equipped with state-of-the-art technology, including gas and water-headers, gas separator, gas filters, Dresser-Rand Make Process Gas compressors, Molecular Sieve based Gas Dehydration Unit, flare system with remote ignition, produced water handling system, RO system, captive power generation system, instrument air system, cooling water and fire-fighting systems, among others.

Currently, 55 wells are connected with GCS-Bokaro and are flowing well fluids, including CBM gas and produced water, which have been used for the PGTR (Performance Guarantee Test Run) and commissioning of the installation. Unlike conventional gas wells, CBM wells require dewatering through artificial lift pumps before achieving sustained gas production.

The successful mammoth task of commissioning of GCS-Bokaro is a result of meticulous planning, round-the-clock operations, supervision, monitoring, and coordination among various teams from across diverse disciplines.

Previous post
Next post

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Health Awareness Talk organised at Fortis Escorts Hospital, Jaipur on World Health Day
  • Young Entrepreneur Rohit Bansal Gives New Direction to EV Infrastructure and Green Mobility in Rajasthan
  •  Union Minister Piyush Goyal Unveils Malabar Gold & Diamonds’ ₹200 Crore CSR Initiative for FY 2026–27
  • IIHMR Startups to Host HealthXchange 2026, Bringing India’s Healthcare Ecosystem on One Platform
  • Cardiac Risks and Sudden Cardiac Arrests Among Youth: What Young Fitness Enthusiasts Must Know
Latest News
Health & Lifestyle

Health Awareness Talk organised at Fortis Escorts Hospital, Jaipur on

April 8, 2026
Business

Young Entrepreneur Rohit Bansal Gives New Direction to EV Infrastructure

April 7, 2026
Business

 Union Minister Piyush Goyal Unveils Malabar Gold & Diamonds’ ₹200

March 27, 2026
Education

IIHMR Startups to Host HealthXchange 2026, Bringing India’s Healthcare Ecosystem

March 27, 2026
Copyright © 2026 Qoxag. All Right Reserved.